• Home
  • About Gardy
  • Product Center
  • Products Equipment
  • News
  • Careers
  • Contact Us
N
EWS


dynamic
  • Company News
  • Industry Trends
  • Social Responsibility
Annual press conference and spring dinner
  • 2023

    07-28

    Challenge yourself, break through the limits, and achieve good results on the competition field

    Find out more>
  • 2023

    07-05

    Dongguan integrity of the fourth tug-of-war competition

    Find out more>
  • 2023

    01-29

    Dongguan Chengxin Electronics 2023 construction began

    Find out more>
  • Intelligent transportation, inspection, analysis and decision system efficiently supports anti-epidemic and power preservation
    Since the outbreak of the novel coronavirus epidemic, the special and ultra-high voltage power grids of the provincial power company have been rationally allocated within and outside the province, and transported to the load center through transmission channels, providing a strong energy support for the province to fight against the epidemic and efficiently support the epidemic, protect the people's livelihood, and resume production. The provincial power company shoulders the heavy responsibility of "protecting the power grid" against the epidemic. The intelligent transportation inspection analysis and decision-making system of the provincial Electric Power Company, which is built by Jicheng Electronics, fully integrates the information of various automation systems, uses cloud computing, big data and artificial intelligence technology, and finds the abnormal power substation equipment and environment in time by improving the frequency of online remote automatic inspection during the epidemic prevention and control period, and combines the epidemic information to assist the planning of the site
    2023-12-02
  • China Southern Power Grid's "Research and Implementation of Long-stride electromagnetic transient algorithm" successfully passed the project acceptance
    On September 19, 2019, the Research Institute of Southern Power Grid held the acceptance review meeting of "Research and Real Adjustment of Transient Usage of Giant Electric Power Camp" commissioned by the project "Research and Implementation of Giant Electromagnetic Transient Algorithm" at the Research base of Guangzhou Southern Power Grid. The director of the system of the Research Institute chaired the meeting, and the expert group composed of relevant experts from South China University of Technology, Guangdong Electric Power Design Institute, Southern Network General Survey, Guangdong Institute of Electrical Science and Technology and Southern Network Division successfully passed the project acceptance research Institute listened to the project report, gave a high evaluation of the results achieved by the project, and successfully completed the final acceptance.
    2023-12-02
  • About Gardy
    Company Profile Development History Corporate Honors Global Layout
    Product Center
    Photovoltaic Connector Engineering Equipment Automotive Parts Smart Home System Personal Protective
    Products Equipment
    Injection Molding Equipment Mold Equipment Testing Equipment
    News
    Company News Industry Trends Social Responsibility
    Careers
    Recruitment Company Environment
    Contact Us
    Contact Us Online Message
  • Contact US

    +86 0769-8550 7262

    Public Account

©2023 东莞诚信电子塑胶有限公司 版权所有

粤ICP备12085491号-1